Testimonial
Glad to share the feedback from our clients
Intrelec is a regular vendor for our cement business. Over the years Intrelec has supplied several PCCs and MCCs with drawout as well as fixed feeders. We appreciate the quality of the supplied panels as well as the support extended in timely delivery of panels.
Intrelec has supplied 65kA 4000A LT Switchgear Panels and Busducts for our caustic soda plant at Balabadhrapuram. We confirm the delivery was within the agreed time frame. Further the quality of the panels and busducts is as expected and the performance has been satisfactory beyond 1 year of commissioning.
This Is to certify that INTRELEC has supplied various panels 5OOOA PCCs for our GREEN FIELD FIBRE OPTIC CABLE PROJECT AT CHAKAN PUNE. The total value of the equipments supplied Is approximately 9.00 Crores and the entire delivery was completed within 3-4 months. We are very much Impressed with the quality of the equipments along with workmanship demonstrated by Intrelec.
It has been observed that INTRELEC team is proficient with its ability to understand stringent engineering standards and were prompt in every aspect of their execution of the project i.e. drawing submission, delivery
commitment and after sales site services.
The Busducts and Switchgear Panels supplied by INTRELEC have been installed and commissioned at site and have been operating trouble free for more than 4 years.
It is generally observed by KCM that the panels are of good quality with high quality finish and excellent workmanship
Intrelec has supplied Drawout PMCC along with other auxiliary LT Boards. We confirm that Intrelec had successfully and satisfactorily completed the job. All the panels have been commissioned more than 1 year ago and the performance has been satisfactory till date.
Intrelec has supplied Drawout Intelligent MCC integrated with a PLC system for our IPA-2 & WET IPA project. In this regard we can confirm that Intrelec’s understanding and ability to design and execute Intelligent MCC with PLC had met our expected standards. Furthermore, they had extended the required support in timely submission of drawings as well as delivery of the MCC.
We also were satisfied with the on-site support extended by Intrelec during the commissioning activity. The commissioning of the IMCC+PLC has been completed over a year ago and in general no technical issues have been faced so far.
Intrelec supplied large rating equipments such as 5000 Amps PCC, MCCs for boiler and turbine, Lighting and Power distribution boards as well as 6300 Amps and 5000 Amps LV Busducts.
All the above equipments have been commissioned and are operating trouble free. We have found the design and quality of the equipments to
our satisfaction